{"page":{"id":386,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://stickystory.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-31\">October 31, 2026</time></p>\n<section class=\"policy-summary\">\n<h2>Changes and cancellations at a glance</h2>\n<ul>\n<li><strong>Window:</strong> 24 hours from the moment you place the order.</li>\n<li><strong>What you can change:</strong> names, wording, dates, photo links, size, finish, colour, quantity and the shipping address.</li>\n<li><strong>Cancel within 24 hours:</strong> full refund, nothing to send back.</li>\n<li><strong>After 24 hours:</strong> the order may already be printed. You can still return it within 60 days of delivery with a free return label.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@stickystory.shop\">support@stickystory.shop</a> with your order number. There is no phone line or chat.</li>\n</ul>\n</section>\n<h2>1. Why there is a 24-hour window</h2>\n<p>Most of what we sell is made from the words and photos in your order notes. Once a sheet of name labels is printed or a family decal is cut and weeded, it cannot be un-printed, and a correction means starting again. Our processing time is only 1-3 business days, so orders move into production quickly.</p>\n<p>The 24-hour window is the time we keep an order open for second thoughts. Inside it, almost anything can change at no cost. After it, we cannot promise that an order has not already been printed, cut or packed.</p>\n<p>The 24 hours run from the time on your order confirmation email, including weekends. An order placed at 9:15 pm on Friday can be changed until 9:15 pm on Saturday.</p>\n<h2>2. What you can change</h2>\n<table class=\"policy-table\">\n<caption>Changes we can make within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to send us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Spelling or wording</td>\n<td>&#8220;Isabel&#8221; should be &#8220;Isabelle&#8221;</td>\n<td>The full corrected text, not just the changed letter</td>\n</tr>\n<tr>\n<td>Dates</td>\n<td>Save-the-date shows the wrong day</td>\n<td>The date in the exact format you want printed</td>\n</tr>\n<tr>\n<td>Photo</td>\n<td>A sharper picture of your dog for the pet portrait sticker</td>\n<td>A new link that opens without a login</td>\n</tr>\n<tr>\n<td>Size, finish or colour</td>\n<td>4 inch glossy to 3 inch matte; white vinyl to silver</td>\n<td>The new option; we tell you if the price changes</td>\n</tr>\n<tr>\n<td>Quantity or pack</td>\n<td>60 labels to 120 labels</td>\n<td>The new pack; we tell you if the price changes</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>Send to grandma instead of home</td>\n<td>The complete new address in one of our four countries</td>\n</tr>\n<tr>\n<td>Add an item</td>\n<td>A second decal for the other car</td>\n<td>Usually quickest as a separate new order</td>\n</tr>\n</tbody>\n</table>\n<p>If a change makes the order more expensive (a bigger size or a larger pack), we email you a simple way to pay the difference. If it makes the order cheaper, we refund the difference to your original payment method. We confirm every change by email before it takes effect, so you always have it in writing.</p>\n<h2>3. How to ask for a change</h2>\n<ol>\n<li>Email <a href=\"mailto:support@stickystory.shop\">support@stickystory.shop</a> from the address you used at checkout if you can.</li>\n<li>Use the subject line &#8220;Change order #&#8221; followed by your order number.</li>\n<li>Write the complete corrected details. For a family decal, rewrite the whole line-up; for a sticker sheet, resend the whole list. This avoids mixing old and new notes.</li>\n<li>Wait for our confirmation email. A change is only final when we confirm it.</li>\n</ol>\n<p>We reply within 24 hours on business days. If your 24-hour window is about to close on a weekend, send the email anyway: the time your email reaches us is what counts, not the time we read it.</p>\n<h2>4. How to cancel</h2>\n<p>To cancel, email us within 24 hours with the subject &#8220;Cancel order #&#8221; and your order number. One line is enough: &#8220;Please cancel my order.&#8221; You do not need to give a reason.</p>\n<p>When we confirm the cancellation, the full order total is refunded to your original payment method. Nothing is shipped, so there is nothing to return. Your bank or payment provider may take a few business days to show the refund; see the <a href=\"/refund-policy/\">Refund Policy</a> for details.</p>\n<p>If your order used photos, the links and any files we had already downloaded are deleted after the cancellation.</p>\n<h2>5. After 24 hours</h2>\n<p>Once the window has closed, we may already be printing, cutting or packing. We still read every late request, and if your order has not started yet we will try to help, but we cannot promise it.</p>\n<p>If the order has already been made, it ships as normal. When it arrives you still have our full return policy: 60 days from delivery, a free return label, and a refund within 7 days of the return reaching us. In other words, a late change of mind is never a dead end. The details are on the <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges</a> page.</p>\n<h2>6. Typos: the most common reason to change an order</h2>\n<p>Since we do not send a proof before production, the order notes you type at checkout are exactly what we print. The most common changes we see are small typing slips. A few habits help avoid them:</p>\n<ul>\n<li><strong>Type names in full and in the right case.</strong> &#8220;mia&#8221; and &#8220;Mia&#8221; print differently. If you want all lowercase, say so.</li>\n<li><strong>Write numbers clearly.</strong> For dates, write the month as a word if there is any doubt (October 18, 2027 rather than 10/18/27).</li>\n<li><strong>Separate items in a list.</strong> Number each name on a party favour list so we do not merge two names.</li>\n<li><strong>Check special characters.</strong> Accents, apostrophes and ampersands (José, O&#8217;Brien, Ana &amp; Sam) are printed as typed.</li>\n<li><strong>Read it aloud once.</strong> It sounds silly, but it catches &#8220;Parkrs&#8221; every time.</li>\n</ul>\n<p>If you notice a typo after placing the order, email us right away. Inside 24 hours, it is a two-minute fix.</p>\n<h2>7. Changing the shipping address</h2>\n<p>Address changes follow the same 24-hour window. We can ship only to the United States, Canada, Australia and New Zealand, so a new address must be in one of those countries. After the parcel has been handed to the carrier, we can no longer change the address ourselves; the <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page explains what you can try with the carrier.</p>\n<h2>8. Orders waiting for information</h2>\n<p>Sometimes we email you because something is missing: a photo link that does not open, a monogram without the letters, a stick-figure family with no figures listed. Those orders are paused until you reply. While the order is paused, you can still change or cancel it, even if more than 24 hours have passed, because production has not started. As soon as you send the missing details, the 1-3 business day processing time starts.</p>\n<h2>9. Things we cannot change</h2>\n<ul>\n<li>An order that has already been shipped.</li>\n<li>The payment method used for an order (cancel and reorder instead, within 24 hours).</li>\n<li>Delivery to a country we do not ship to.</li>\n<li>Requests to print artwork, logos or characters you do not have the right to use. See the <a href=\"/intellectual-property-policy/\">Intellectual Property Policy</a>.</li>\n</ul>\n<h2>10. Duplicate orders</h2>\n<p>Pressed &#8220;place order&#8221; twice by accident? It happens, especially on a slow connection. Email us within 24 hours with both order numbers and tell us which one to keep. We cancel the other and refund it in full. If you notice later, we will still help: if both orders have already been made, return one within 60 days with a free label.</p>\n<h2>11. Gifts and surprise orders</h2>\n<p>If you ordered a gift to be shipped directly to someone else, any change request must come from the person who placed the order, using the order number. This keeps addresses and personal details safe. Please do not ask the recipient to contact us about changes, as we cannot share or alter order details without the buyer.</p>\n<h2>12. Product-by-product notes</h2>\n<p>Different products have different things worth double-checking before the 24 hours run out. Here is what we see most often on each shelf.</p>\n<h3>Name stickers and label packs</h3>\n<p>Check the spelling of every name and whether you want a second line such as a class or room number. For return address labels, check the zip or postal code and the apartment number; those are the details people most often notice after ordering. If you are labelling for siblings, say whether the pack should be split between names and how.</p>\n<h3>Photo and pet stickers</h3>\n<p>Open your photo link in a private browser window to make sure it opens without a login. If the picture has several people or pets in it, say which one we should keep. A sharper photo can be swapped in during the 24 hours at no cost, and it makes a real difference on larger sizes.</p>\n<h3>Family and car decals</h3>\n<p>Measure the glass or surface before the window closes. A decal that is too wide for a side window is the most common size change we make. For stick-figure families, write the figures from left to right exactly as they should appear, and remember the pets. For mailbox decals, confirm the house number twice.</p>\n<h3>Sticker sheets and party favours</h3>\n<p>Compare your guest list with the class list or invitation list. Number every name. If a child&#8217;s name is spelled in an unusual way, write &#8220;spelling is correct&#8221; next to it so we do not stop to ask.</p>\n<h3>Magnets</h3>\n<p>For car door magnets, check with a fridge magnet that the door panel is steel before the 24 hours pass; magnets do not hold on aluminium or plastic panels. For save-the-date magnets, check names, date, city and any extra line, and whether you need 25 or 50.</p>\n<h2>13. Why we do not send proofs</h2>\n<p>Some shops send a digital mockup and wait for approval before printing. We do not, and that is a deliberate choice: it keeps processing to 1-3 business days and keeps prices simple. The flip side is that your order notes are the final word. The 24-hour change window, together with the 60-day return policy and its free return label, is how we make that fair to you. If a result does not match your notes, that is our mistake and we put it right with a reprint or refund.</p>\n<h2>14. Quick checklist before you click &#8220;Place order&#8221;</h2>\n<ul>\n<li>Every name, word and date in the order notes is spelled the way you want it printed.</li>\n<li>Photo links open in a private browser window.</li>\n<li>The size suits the surface you measured, and the colour contrasts with it.</li>\n<li>The shipping address is complete, with the unit number and postal code.</li>\n<li>Your email address is correct, so our confirmation and any questions reach you.</li>\n</ul>\n<p>Two minutes with this list saves most change requests.</p>\n<h2>15. Examples</h2>\n<ul>\n<li><strong>Size swap:</strong> Priya ordered a 30 inch back-window banner and then measured her hatchback. Within the 24 hours she switched to 22 inches, and the price difference was refunded.</li>\n<li><strong>Photo swap:</strong> Daniel sent a blurry photo for a pet portrait sticker. He sent a sharper link two hours later, and we used the new one.</li>\n<li><strong>Late change:</strong> Kim asked to change a label pack three days after ordering. It had already been printed, so it shipped as ordered; she returned it with our free label and placed a new order.</li>\n</ul>\n<p>These are examples of how the policy works, not reviews or records of real customers.</p>\n<h2>16. Contact</h2>\n<p>Email <a href=\"mailto:support@stickystory.shop\">support@stickystory.shop</a>. Replies within 24 hours on business days. For other ways to get help, see the <a href=\"/help-center/\">Help Center</a> and our <a href=\"/faqs/\">FAQs</a>.</p>\n<p>Sticky Story · 4245 Glendale Rd, Woodbridge, VA 22193, US.</p>\n","visible_characters":10199,"meta_description":"Change names, photos, sizes, colours or address, or cancel for a full refund, within 24 hours of ordering at Sticky Story. How to ask and what to send.","parent":null,"published_at":"2026-10-30T23:22:55+00:00","updated_at":"2026-10-30T23:41:02+00:00"}}